VERTIC's ALTIRAIL horizontal fall protection rail system on ALBIOMA's photovoltaic panels

VERTIC chosen by Albioma for the securisation of its photovoltaic power plant

Albioma is focusing on three-fast growing sectors: thermal biomass, anaerobic digestion and solar power.
This independent energy producer has already been a strong partner of VERTIC for many years. Last year, we installed together several BATILIGNE horizontal lifelines on its photovoltaic power plants in Mayotte in the West Indies.
Last week, it is in Cambaie on the Reunion Island, that we secured a 434 kWC-Nestlé-photovoltaic power plan with two horizontal fall protection rail systems of 60 meters each. They were both fixed on specific plates and enabled users to work at distance from the system without any locking.

This huge installation has been tailor-made by our teams in charge of specific projects and Albioma’s ones!

Retour en haut